Home

Toyota Workshop

GSIC - Global Service Information Center

SOLAR VENTILATION SWITCH > INSTALLATION

for Preparation Click here



1. INSTALL SOLAR VENTILATION SWITCH


    E189039
  1. Engage the 2 claws to install the solar ventilation switch.



2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY
  1. Connect each connector.

  1. Engage the clamp.



    B223463
  1. Engage the 2 guides and claw to connect the hood lock control cable.



    B223462
  1. Engage the 6 claws and clip.



    B223460
  1. Install the lower instrument panel finish panel assembly with the screw <C>.



3. INSTALL COWL SIDE TRIM SUB-ASSEMBLY LH


    B227764
  1. Engage the 2 clips.

  1. Install the cowl side trim board LH with the clip.



4. INSTALL FRONT DOOR SCUFF PLATE LH


    B227761
  1. Engage the 10 claws to install the front door scuff plate LH.