Home

Toyota Workshop

GSIC - Global Service Information Center

BATTERY SMART UNIT > INSTALLATION

for Preparation Click here



1. INSTALL BATTERY SMART UNIT

CAUTION:
Be sure to wear insulated gloves and protective goggles.



    A215060
  1. Install the battery smart unit with the 2 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the 3 connectors.

    NOTICE:
    The connectors should be connected securely.



2. INSTALL HYBRID BATTERY JUNCTION BLOCK

HINT:
Click here.