FRONT CRANKSHAFT OIL SEAL > INSTALLATION |
1. INSTALL TIMING CHAIN COVER OIL SEAL |
Apply MP grease to the lip of a new oil seal.
![]() |
Using SST and a hammer, tap in the oil seal until its surface is flush with the front oil seal retainer edge.
2. INSTALL CRANKSHAFT PULLEY |
Align the pulley set key with the key groove of the pulley.
![]() |
Using SST, hold the pulley in place and tighten the bolt.
*a | Hold |
*b | Turn |
3. INSTALL REAR SIDE RAIL REINFORCEMENT SUB-ASSEMBLY RH |
![]() |
Install the rear side rail reinforcement sub-assembly RH with the 4 bolts.
4. INSTALL FRONT WHEEL RH |
5. INSPECT FOR OIL LEAK |
6. INSTALL REAR ENGINE UNDER COVER RH |