INSTALL SHIFT LOCK CONTROL UNIT ASSEMBLY
INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY
INSTALL SHIFT LEVER KNOB
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
INSTALL REAR NO. 3 FLOOR BOARD
INSTALL REAR DECK FLOOR BOX
INSTALL REAR NO. 2 FLOOR BOARD
INSPECT SHIFT LEVER